Koeberg en afvalmateriaal

*
In elke werksplek word foute gemaak en enige persoon kan leer uit foute.   Maar, kan Koeberg net nog ‘n Tsjernobil word?     Sommige dink dit is onwaarskynlik, maar nie onmoontlik nie.   Daar is GEEN waarborge teen ‘n soortgelyke ongeluk nie.    Die gebied wat Koeberg in gebou is asook omring word met stedelike gebiede, is ook nie dieselfde as Tsjernobil nie.    Daar is geen waarborge dat daar ‘n 100% noodplan en ontruiming in werking is nie.   Dit is en bly kommerwekkend.    Wat indien daar ‘n halfgebakte plan in werking is en dis veronderstel om die hele gebied te ontruim weens radio-aktiwiteite.   Kan Suid-Afrika so iets bekostig?

Radioactive waste storage at Koeberg very close to full


*

Die herinnering is dat groot krag gepaard gaan met groot verantwoordelikheid.   Onderhoud is van kardinale belang.  Kernkrag is ongelooflik doeltreffend en veilig, maar raak selfvoldaan en dit kan dele grond, leë dorpe vernietig en vir duisende jare prut. Tsjernobil was ‘n les: hopelik het die mense op al die kontinente geleer, ook die wat Koeberg bestuur, moet luister.

Kernkragreaktors gebruik swaar elemente soos uraan om water te kook en stoom te produseer, wat ‘n turbine laat draai om elektrisiteit op te wek. Steenkoolkragstasies werk op dieselfde manier, behalwe dat ‘n kilogram uraan meer as ‘n miljoen keer soveel krag as ‘n kilogram steenkool kan opwek. Dit vereis ‘n noukeurige balans binne wat in wese ‘n reuse, hoëdruk en radioaktiewe ketel is. Kry daardie balans verkeerd en dinge kan vinnig sleg gaan.

Die Koeberg-reaktors is volgens ‘n latere tegnologie gebou as dié van veral Tsjernobil, en hul ontwerp sluit bykomende veiligheidsmeganismes in.    By Tsjernobil was daar byvoorbeeld geen 1m-dik betonomhulsel nie [‘n Koeberg-kenmerk] en so het die ontploffing die dak aan flarde geskeur, en die hoogs besmette, sterk uitstralende materiaal het dadelik ontsnap.

*

Die maatskappy Holtec het in 2015 ‘n kontrak vir die verskaffing van die HI-STAR 100 dubbeldoel metaalvate vir Koeberg Kernkragstasie in Suid-Afrika gekry. Die kontrak tussen Eskom en Holtec is in Mei 2015 onderteken na aanleiding van ‘n streng internasionale bodkompetisie wat vir meer as ‘n jaar geduur het.    Holtec sal ons bewese HI-STAR 100 dubbeldoel-metaalvat verskaf, ontwerp vir die berging en vervoer van drukwaterreaktor (PWR) gebruikte brandstofsamestellings.

Dit is nou skaars 7 jaar later ….

Die HI-STAR 100 is vir die eerste keer gelisensieer vir berging onder 10CFR72 regulasies in die Verenigde State in 1999, en vir vervoer volgens 10CFR71/TS-R-1 in 2000. Benewens die Amerikaanse werwe wat tans die HI-STAR 100 ontplooi, Holtec het ook die HI-STAR 100 vir die Spaanse kernvloot gelisensieer en verskaf waar hulle in diens geneem sal word om brandstof van die reaktorkant-bergingsfasiliteite na die sentrale bergingsfasiliteit te vervoer, wat tans deur ENRESA ontwikkel word.

Die kontrakomvang van werk sluit ook ontwerp en verskaffing van die nodige hanteringstoerusting vir die projek, lisensie-ondersteuning, opleiding en vatlaaidienste in. Die omvang van die werk sal volgens ‘n ooreengekome streng skedule voltooi word, om die voortgesette bedryf van Koeberg Kernkragstasie (Eenheid 1 en 2) te ondersteun, met die meeste van die werk wat voltooi moet word voor die beplande onderbrekings in Maart/September 2018. Ten spyte van die stywe skedule, is Holtec daartoe verbind om sy rol te speel in terme van verskaffer-ontwikkeling en lokalisering ter ondersteuning van die projek.

Holtec se Direkteur van Internasionale Projekte, Dr. Rick Springman, het gesê: “Ons verstaan die kritieke belangrikheid vir Eskom om die voortgesette werking van die Koeberg-eenhede deur 2018 te verseker en ons vertikaal-geïntegreerde voorsieningsketting, wat ons bewese Holtec-vervaardigingsafdeling (HMD) insluit. sal deurslaggewend wees in die ondersteuning van die saamgeperste projekskedule. Ons sien uit daarna om saam met Eskom se bekwame projekspan en die Nasionale Kernreguleerder (NNR) te werk om te verseker dat die vate op skedule gelaai word.”

*

Eskom het in 2015 ’n geraamde 200 miljoen rand ($13,60 miljoen) betaal vir ’n aanvanklike bondel van sewe versterkte droë opbergvate van die Amerikaanse energiemaatskappy Holtec International om te help om Koeberg na 2018 aan die gang te hou.      Eskom het nege nuwe ongebruikte vate op die perseel, elk met ‘n individuele kapasiteit van 32 gebruikte brandstofsamestellings, met nog vyf wat na verwagting binnekort afgelewer sal word.     Die ander vate was leeg op die Koeberg-perseel gestoor terwyl Eskom besig is om aansoek te doen vir ‘n gebruikslisensie by die Nasionale Kernreguleerder (NNR).  Die  vate behoort tot 2024 te verseker dat daar voldoende stoorplek in die gebruikte brandstofpoel is, het Eskom gesê voor ‘n tender vir ‘n ekstra 30 vate.  Earthlife Africa was nie so gelukkig met die toedrag van sake nie.

*

Die berging van hoëvlak-radioaktiewe afval is ‘n groot omgewingsbekommernis in die streek, aangesien SA probeer om Koeberg se lewe vir nog twee dekades te verleng en ekstra kernkragsentrales oorweeg.     Koeberg, Afrika se enigste kernkragaanleg, is sowat 35 km van Kaapstad geleë en is in die 1980’s onder apartheid aan die netwerk gekoppel.

Die Koeberg-brandstofpoel se stoorkapasiteit is tans meer as 90% vol. [Hierdie] poele sal [hul] kapasiteit teen April 2020 bereik, het Eskom in ‘n verklaring aan Reuters gesê.   Koeberg produseer sowat 32 ton gebruikte brandstof per jaar. Brandstofsamestellings, wat radioaktiewe materiale insluitend uraan en plutonium bevat wat vir duisende jare gevaarlik kan bly, word vir ‘n dekade onder water in gebruikte brandstofpoele afgekoel.

Die NNR het gesê Eskom het slegs toestemming gehad om vier droë vate by Koeberg te stoor en dat die kragvoorsiener aansoek gedoen het vir ‘n lisensieveranderingsversoek wat die gebruik van 14 bykomende droë opbergvatte regverdig.

Earthlife Africa het gesê SA kan nie die sosiale, omgewings- en ekonomiese koste verbonde aan kernafval bekostig nie.    Kaapstad is ‘n tikkende bom met hoëvlak-afval en brandstofstawe by Koeberg.

*

Bronne

Koeberg
2015

We are pleased to announce that Holtec has been awarded a contract for supply of the HI-STAR 100 dual-purpose metal casks for Koeberg Nuclear Power Station in South Africa. The contract between Eskom and Holtec was signed in May 2015, following a rigorous international bidding competition that lasted for over a year. Holtec will be supplying our proven HI-STAR 100 dual-purpose metal cask, designed for storage and transportation of Pressurized Water Reactor (PWR) spent fuel assemblies. The HI-STAR 100 was first licensed for storage under 10CFR72 regulations in the United States in 1999, and for transport according to 10CFR71/TS-R-1 in 2000. In addition to the U.S. sites currently deploying the HI-STAR 100, Holtec has also licensed and supplied the HI-STAR 100 for the Spanish nuclear fleet where they will be put into service to transport fuel from the reactor-side storage facilities, to the central storage facility, currently under development by ENRESA.

https://holtecinternational.com/2015/08/10/holtec-awarded-contract-for-supply-of-dual-purpose-metal-casks-for-koeberg-nuclear-power-station-in-south-africa-2/

2019

Storage of high-level radioactive waste is a major environmental concern in the region, as South Africa looks to extend Koeberg’s life for another two decades and mulls extra nuclear power plants.   Koeberg, Africa’s only nuclear facility, is situated about 35 km (21.75 miles) from Cape Town and was connected to the grid in the 1980s under apartheid.

Three years ago Eskom paid an estimated 200 million rand ($13.60 million) for an initial batch of seven reinforced dry storage casks from U.S. energy company Holtec International to help keep Koeberg running beyond 2018.

https://www.iol.co.za/business-report/companies/waste-storage-at-koeberg-nuclear-plant-brimming-37936997

https://www.businesslive.co.za/bd/national/2019-11-25-radioactive-waste-storage-at-koeberg-very-close-to-full/

2022

Unit 1 went into commercial operation in 1984 and Unit 2 in 1985. Eskom is planning to extend operation of the units by 20 years until 2045 for a total operational lifetime of 60 years each. The plant is currently carrying out a periodic safety review to identify safety improvements for the LTO period.

The ten-person team comprising experts from Argentina, Belgium, Czech Republic, France, Hungary, Pakistan, Spain, Sweden and two IAEA staff members reviewed the plant’s preparedness, organization and programmes for safe LTO.

LTO of nuclear power plants is defined as operation beyond an established time frame determined by the license term, the original plant design, relevant standards, or national regulations. As stated in IAEA safety standards, to maintain a plant’s fitness for service, consideration should be given to life limiting processes and features of systems, structures, and components, as well as to reasonably practicable safety upgrades to enhance the safety of the plant to a level approaching that of modern plants.

https://www.ans.org/news/step-1649082603/

*

VERWANTE ARTIKELS

Koeberg nagmerrie

Chernobyl and radiation

Russia – Nuclear powered cruise missile Burevestnik

“Burevestnik” – Russia

Russia, NATO and America

Russians: Poseidon nuclear torpedo

There is no man anywhere the village name is Pripyat, place name Chernobyl. 32 years have passed.

City of Death

Russia –  Nuclear powered cruise missile Burevestnik

Nuclear testings –  UN

Nuclear testings – Russia 2020

RFNC-VNIIEF falls under Russia’s top nuclear Corporation, Rosatom,
Burevestnik  – Russia

2017
Burevestnik and Russia

Russia – Nuclear powered cruise missile Burevestnik

Russia’s Deadly Nuclear Explosion

*

Sabotage inside Eskom 2020 report

Eskom – Matshela Koko

Daar gaan nog lank betaal word vir hierdie “foute” wat ingebou is, sodat die bestuur in beheer ons belastingbetalers kan melk hiervoor.   Hulle is waarskynlik betaal deur ander bo-oor hulle om dit enduit te voer.

Sabotasie word verseker baie lank ondersoek
Sabotage at Eskom – terrorism

Wie se planne was dit, sodat Eskom nie aan die kragvoorsiening kon voldoen nie
Eskom design faults

South Africa after 27 years
Escom and the stages of loadshedding – Beurtkrag

Escom power to Africa and South Africa

Sabotage inside Eskom 2020 report

Deliberate Sabotage at Eskom

Eskom – corruption

Eskom sabotage from inside

You at Eskom have only “ducks” –  your excuses are ducks.

Eskom “duck and dive a zero duck jive in a duck economy”

Arnot coal mine

ANC – Lethuli-house can of worms – “Nyani skeletons” – so-called “apartheid” (segregation) and ‘white privileges”

Eskom – Rotek – Shanahan

Eskom Rotek Industries

Eskom and Africa

Eskom inligting en jaarverslae –  Information

Eskom – design faults

Eskom – Medupi (faults)

ANC electricity plan

Enel Green Power RSA (EGP) RSA

Onthou die IPP’s … WHAT ABOUT:
Eskom>AREP>IPP – Ramaphosa>Motsepe>Radebe

Eskom: IPPP: B-BBEE- Karen Breytenbach

Eskom – Radebe – IPP – REIPPP

R131 billion for renewable electricity

Eskom – 27 IPP projects

Turkey Floating Karpowership

Gordhan (what future with Eskom) – Ramaphosa

Eskom is a failure – Eskom se wiele is pap en leeggesuig

Eskom capture

ESKOM – Trillians – Guptas – State capture

Capture of people – Black Empowerment – Zondo

Eskom – Medupi (faults)

Corruption Eskom SA Nuclear Korrupsie

Corruption – Eskom – Parliament

Loadshedding Eskom beurtkrag

SA Parliament Eskom 2 September 2020

Eskom – media

Eskom – ‘design faults’

Eskom – Koeberg

Eskom information and off grid systems

Eskom – Solly Tshitangano

Eskom 2019 – Tutuka

Eskom and Africa

Eskom inligting en jaarverslae – Information

Deliberate Sabotage at Eskom

Eskom – corruption

Eskom – Rotek – Shanahan

Eskom Rotek Industries

Eskom corruption – Michael Lomas

Deliberate Sabotage at Eskom

Eskom – Oracle

May 2020  Transformer theft  –  Diepsloot

*

2019

Nersa and EskomEskom,

Nersa, Salga and Municipalities

Nersa and tariffs

Nersa

Eskom – Koketso Choma – Matshela Koko

Eskom – “new plans from Ramaphosa”

Eskom : Ramaphosa – Motsepe – gas

Eskom: Ramaphosa – Mabuza

BBEE Trustfund Motsepe

B-BBEE – swart bemagtiging – Motsepe

Dr Motsepe

Precious Elizabeth Makgosi Moloi-Motsepe

Strangled Eskom “PYRAMID SCHEMES”

1 gedagte oor “Koeberg en afvalmateriaal”

Lewer kommentaar